Safety First
Project planning begins with identifying hazards, assessing risks and establishing appropriate controls before work starts.
At A.S.A.P. Project Group, safety, compliance and quality are fundamental to every project we undertake. From residential roofing to complex commercial and government works, our team is committed to maintaining strong workplace safety, regulatory compliance and environmental responsibility.
Every project is planned carefully to manage risk, protect workers and occupants, maintain site standards and deliver dependable outcomes from start to finish.
Project planning begins with identifying hazards, assessing risks and establishing appropriate controls before work starts.
Work is carried out in accordance with applicable legislation, SafeWork NSW requirements, Australian Standards and project-specific obligations.
Our workforce includes experienced tradespeople operating under documented procedures, site requirements and appropriate supervision.
Waste, asbestos-containing materials and construction debris are handled, transported and disposed of using responsible work practices.
Our licences and qualifications support the roofing, asbestos removal and high-risk work services undertaken by A.S.A.P. Project Group.
Licensed to carry out relevant roofing and construction work in New South Wales.
Verify Contractor LicenceLicensed to perform asbestos-removal work using controlled procedures and approved disposal practices.
Verify Asbestos LicenceQualified for relevant high-risk work activities associated with project access and site operations.
Verify High Risk Work LicenceSafety requirements vary depending on the property, work environment, access conditions and project scope. Our approach is based on identifying the specific risks associated with each site and applying appropriate controls.
Documentation and procedures are prepared according to the work being undertaken and the requirements of the client, principal contractor or site manager.
SWMS are prepared where required for high-risk construction activities.
Site hazards are assessed and controlled before and during project delivery.
Workers follow project-specific access, induction and operational requirements.
Relevant site risks, work sequencing and control measures are communicated to the team.
Appropriate PPE is selected according to the task, work environment and identified risks.
Conditions and controls are reviewed throughout the project as work progresses.
Asbestos-containing materials require specialist planning, controlled work methods and lawful disposal. A.S.A.P. Project Group carries out licensed asbestos-removal work in accordance with applicable safety and regulatory requirements.
Relevant documentation can be supplied according to project requirements, contract conditions and client onboarding procedures.
Current insurance documentation may be supplied to clients or principal contractors where required.
Relevant contractor, asbestos and high-risk work licence details can be provided for project verification.
Project-specific safety documents may include SWMS, risk assessments, inductions and supporting records.
Our work practices are designed to reduce unnecessary waste, maintain orderly sites and ensure regulated materials are handled responsibly.
Where practical, materials are separated for recycling or appropriate disposal, while hazardous products and asbestos-containing waste are managed through approved channels.
Waste materials are transported to suitable facilities according to material type.
Reusable and recyclable materials may be separated where practical.
Work areas are managed to reduce debris, hazards and disruption.
Regulated materials are handled using appropriate controls and disposal processes.
Long-standing industry experience across roofing and project services.
Verified credentials for the specialist work undertaken by our team.
Supporting residential, commercial, strata, industrial and government projects across our service areas.
Roofing, asbestos removal, transport and waste support through one organisation.
Download the A.S.A.P. Project Group Capability Statement for an overview of our services, project experience, licences and professional standards.
Speak with our team about your project requirements, compliance documentation and the next steps for arranging an inspection or quotation.
St. Ives, Sydney
Kincumber, C. Coast
Mon - Fri
6:30 AM - 4:30 PM
Sydney &
Central Coast